Trial Fit
Our Process Ensures Quality and Efficient Installation
CPF has developed a specialized “trial-fit” process designed to meet cost-containment demands and see that equipment is installed and operates quickly and efficiently.
Before shipping to your site, CPF test-assembles select components in order to preemptively identify and eliminate any problems should they exist before final field fit-up and erection. The components are then marked, disassembled, and shipped to your facility for final installation. This process ensures an easier and less time-consuming field installation resulting in increased cost effectiveness.
Gallery of Trial Fit Assembly
				 
				Trial Fit of Oil Refinery Ductwork Fabricated at our Facilities in Ancaster, Ontario, Canada
				
			
				 
				Trial Fit of a Coal SCR Welded at our Plant in Ancaster, Ontario, Canada
				
			
				 
				Trial Fit of Oil Refinery Ductwork Fabricated at our Facilities in Ancaster, Ontario, Canada
				
			
				 
				Coal SCR lifted into place with a crane at our Brantford, Ontario Location
				
			
				 
				Trial Fit of an Oil SCR Support Structure Inside our Ancaster, Ontario Facilities
				
			
				 
				Trial Fit of an Oil SCR Support Structure inside our Ancaster, Ontario Location
				
			
				 
				Trial Fit of an Upper & Lower Natural Gas Plenum at our Canadian Fabrication Facilities 
				
			
				 
				Trial Fit of an Upper & Lower Coal SCR Hopper at our Ancaster, Ontario Facilities
				
			 
				Oil Refinery Trial Fit of 3 layers of Ducting in our Ancaster, Ontario Location
				
			 
				Oil Refinery Ducting Trial Fit Lift at our Ancaster, Ontario Facilities
				
			 
				Oil Refinery Ductwork Trial Fit in our Brantford Plant